Publication Date:
2003 Contractors experience a loss of productivity when their work is disrupted. This paper evaluates various methods that have been used to estimate the cost of lost productivity and reviews the success or failure of those methods before contract boards of appeal and in courts of law.
Acknowledgments:
Reprinted with the permission of AACE International,
209 Prairie Ave., Suite 100, Morgantown, WV 25601 USA.
Phone: 800-858-COST/304-296-8444. Fax: 304-291-5728.
Internet: http://www.aacei.org. E-mail: info@aacei.org.
Copyright 2010 by AACE International. All rights reserved.


